Under-Counter Washing Machines
Axis Minimum Value (cm) Maximum Value (cm) Minimum Clearance (cm) Maximum Clearance (cm) Total (cm) Width (X) 59.5 60 +0.5 x 2 +1 x 2 60.5 – 62 Depth (Y) 50 65 + 2...
||||||||||||||||||||||||||||||||||||||
Axis Minimum Value (cm) Maximum Value (cm) Minimum Clearance (cm) Maximum Clearance (cm) Total (cm) Width (X) 59.5 60 +0.5 x 2 +1 x 2 60.5 – 62 Depth (Y) 50 65 + 2...
The thickness of plaster can vary depending on the type and purpose of the plastering. Architectural drawings usually show the structural dimensions without finishes. Types of Plaster Thickness (mm) Purpose Base Coat (Undercoat) 10-20...
Axis Minimum Value (cm) Maximum Value (cm) Minimum Clearance (cm) Maximum Clearance (cm) Total (cm) Width (X) 90 95 + 2 x 2 +3 x 2 94 – 101 Depth (Y) 65 75 +5...
The bathtub itself should fit comfortably within the alcove. Here are typical bathtub dimensions that correspond to the alcove sizes: Optimal Size
The term “alcove bath” typically refers to a bathtub that is installed in a recessed three-wall enclosure. This is a common layout in many bathrooms and optimizes the use of space. Here are some...
Initiates project, defines goals, provides funding, and makes final decisions. (Subcontractors: Perform specific tasks (e.g., plumbing, electrical, HVAC), report to general contractor.)